Adustelan Metro Station | ||
---|---|---|
Fischbach Avenue Promenade | ||
Fischbach Avenue Promenade Station platform, 14 February 2016 | ||
Station Statistics
| ||
Lines | A, C, G | |
Location | Fischbach Avenue and Cherry Street
Dartervale, Adustelan CW013 | |
Station Status | Operating | |
Structure | Underground | |
Platforms | 1 | |
Handicapped Accessible? | Yes | |
Rank | Unknown | |
Other Information
| ||
Opened | October 21, 2015 | |
Minecraft Builder | StaticAnnouncement | |
Added to ARHP | Never | |
Station Succession
| ||
Next Station South | Goldwater-Crestman Hospital (Line A)
Quarry Pit (Line C) | |
Next Station East | Dartervale (Line G) | |
Next Station West | Cirrus Avenue (all Lines) | |
Stations of the Adustelan Metro | ||
Fischbach Avenue Promenade is a major transfer station of the Adustelan Metro located at the Fischbach Avenue Promenade in Dartervale. It is serviced at all times by Lines A, C, and G (known west of Dartervale as the Main Line).
The station has entrances at both Fischbach Avenue and Hall Boulevard. It is one of the largest stations in the system.
History (fictional)[]
The main line of the Adustelan Metro, consisting of services A, C, and G, has had a tentative station at Fischbach Avenue drawn out since 2001, when the G platform of the Dartervale station opened, as part of the Main Line extension. Most stations on the proposed line opened by 2003. However, budget constraints would ultimately force Fischbach Avenue Promenade, the only station on the Main Line extension located east of the Jennaviva River, to be held off indefinitely.
The project would commence once again in late 2014; it officially opened to the public on October 21, 2015.
Development in Minecraft[]
The station replaced an earlier station at Cadence Lane that was built in 2012 and abandoned in early 2014. The station at Fischbach Avenue has been on tentative maps since early 2014, but StaticAnnouncement did not align the new configurations of the A, C, and G tracks until August 2015. The station itself would not commence construction until mid October, and would not be completed until October 21, 2015 (side note: Back to the Future II Day).